Skip to content

How do I lay sod?

Test the soil a month ahead, then till in the lime and fertilizer it calls for, rake the bed smooth and firm, and have the sod cut for the day you lay it. Start along a straight edge, stagger the seams like brickwork, push pieces tight without stretching them, roll the whole area, and water it thoroughly right away.

Free to ask. Local shops send quotes, and you pay only when you book one.

By Kasra Taheri, Founder, LoclisPublished

Researched and drafted with AI, then checked claim by claim against the sources listed below before it was published. Prices and rules change; the dates beside each source say when it was last checked.

Step by step

Read when to stop and call a pro, further down this page, before you start.

  1. Step 1: Pick the season

    Lay tall fescue or Kentucky bluegrass sod in fall or spring, and bermudagrass or zoysiagrass from late spring through summer, when each grass is growing.[1]

  2. Step 2: Test the soil a month ahead

    Send a soil sample to your county Extension office about a month before you prepare the ground, so you can follow its lime and fertilizer advice.[1]

  3. Step 3: Measure and order

    Measure the area in square feet, divide by 9 to get square yards, and call the grower as far ahead as you can.[1]

  4. Step 4: Call Virginia 811

    Request a utility locate at least 3 working days before you till or dig, even for shallow work.[5]

  5. Step 5: Clear and till

    Strip old grass, weeds and debris, then work the soil-test amendments into the top 4 to 6 inches.[1]

  6. Step 6: Rake smooth and firm

    Rake or drag the bed level and pick out stones larger than 1.5 inches across.[1]

  7. Step 7: Time the delivery

    Have the sod cut for the day you lay it, and keep it in shade if it cannot all go down within eight hours of harvest.[1]

  8. Step 8: Freshen the bed

    Lightly rake the soil just before laying; sod takes best on soil that is moist and cool.[1]

  9. Step 9: Start on a straight line

    Lay the first row along a driveway, sidewalk or a string pulled tight between two stakes.[1]

  10. Step 10: Stagger and butt the seams

    Offset the joints in each row like brickwork and push pieces tightly together without stretching them.[1]

  11. Step 11: Trim to fit

    Cut pieces around beds, curves and edges with a sharp utility knife or a flat spade, and avoid small slivers at the edges.

  12. Step 12: Roll it

    Go over the finished area with a heavy hand roller to press roots into the soil and remove air pockets.[1]

  13. Step 13: Water section by section

    Soak each finished section right away instead of waiting until the whole lawn is laid.[1]

  14. Step 14: Check rooting at a week

    Gently tug a corner about seven days after laying; once it resists, move to deeper, less frequent watering.[1]

  15. Step 15: Mow once it is rooted

    Mow with a sharp blade once the sod is rooted and the soil is firm enough to hold you and the mower.[1]

Laying sod is a one-day job if the ground is ready, and most of the success happens before the first roll arrives. Prepare the soil properly, have the sod cut for the day you lay it, set it tight with staggered seams, roll it, and soak it. Then keep it moist until it roots.

Three workers press strips of new sod onto a bare, sloped bank, with stacked rolls of sod on pallets behind them
Photo: Distinct Lawns, CC BY-SA 4.0, via Wikimedia Commons

Choose the grass and the season

Buy the grass that suits your yard, not just what is on the pallet. Most cool-season sod grown in Virginia is a blend or mixture, and the most popular is tall fescue with 10 to 15 percent Kentucky bluegrass by weight.[1] It does well across the state, though the bluegrass tends to take over the stand as the years go by.[2] Bermudagrass and zoysiagrass sod turn straw-colored at the first frost and stay dormant through a Virginia winter,[1] so they suit sunny lawns where you want a warm-season grass.

The ideal time is the grass's main growing season: fall or spring for tall fescue and Kentucky bluegrass, late spring through summer for bermudagrass and zoysiagrass.[1] That said, sod can go down almost any time of year as long as the ground is not frozen and you can water it.[1]

Prepare the soil

Send a soil sample to your county Extension office about a month before you prepare the ground,[1] so you know how much lime and fertilizer to add. Sod hides a bad base for a while, but it does not fix it. Inadequate soil preparation is one of the most common mistakes in sod installations.[1]

Strip the old grass and weeds, loosen the soil, and work the amendments into the top 4 to 6 inches.[1] Then rake or drag the area smooth and remove stones and debris more than 1.5 inches across from that root zone.[1] Shape the surface so water drains away from the house, and set the soil slightly below walks and driveways so the finished sod sits flush.

Before you till, request a utility locate. Virginia 811 says to contact it at least 3 working days before breaking ground, and there is no depth below which you can skip the call.[5]

Order and handle the sod

One square yard is 9 square feet, and 1,000 square feet is about 111 square yards.[1] A pallet of standard small rolls usually holds 450 to 700 square feet.[1] If you are hauling it yourself, check your vehicle's capacity: dry sod weighs about 20 to 25 pounds per square yard and wet sod 30 to 40 pounds.[1]

A pallet of rolled sod stacked beside a curb on a bare, prepared bed of soil
Daderot, CC0, via Wikimedia Commons

Sod is perishable and should be installed within eight hours of harvest.[1] If you are driving it home, light, vented covers cut drying and heat build-up on hot days when the drive is an hour or more.[1] Do not leave stacked rolls sitting in the sun.

Lay it

Never lay sod over existing grass, debris or rocks.[1] Rake the bed lightly, start the first row against a straight edge such as the driveway, and work outward. Stagger the joints in the next row like brickwork, and push each piece tightly against its neighbors, because sod can shrink after it is laid.[1] Do not stretch pieces to close a gap; cut a new piece instead.

Kneel on a board on the sod you have already laid rather than on the prepared soil. Move rolls with a wheelbarrow and lay plywood over busy paths to limit soil compaction.[1]

On a slope, lay the strips across the slope, perpendicular to the way water runs, and staple the corners and middle of each strip.[4] When the area is done, roll it with a heavy hand roller so the roots meet the soil.

Water it right away

Soak each section as soon as it is down rather than waiting for the whole lawn. In hot weather, above 80°F, water the sod every day, soaking the soil thoroughly, until it is well rooted.[1] Newly sodded lawns need more frequent watering for the first three to four weeks[3] than an established lawn. After about a week, tug a corner: once it resists, switch to deeper, less frequent watering. The full schedule is in how often to water new sod.

When you start mowing, never remove more than one-third of the green leaf at a time.[1] Mow tall fescue and Kentucky bluegrass lawns at 2 to 3 inches, and bermudagrass and zoysiagrass at 1 to 1.5 inches.[1] If the new lawn starts to yellow, see why new sod turns brown.

Stop and call a pro if

  • The yard needs real regrading, fill or drainage work to move water away from the foundation. Get the grade right before any sod is ordered.
  • The area is a steep bank you cannot stand on safely, or water already cuts channels across it.
  • The job calls for big-roll sod. Single big rolls start at about 2,000 pounds each,[1] and moving them takes trucks and equipment.
  • Utility marks run through the area and the work means digging near them.
  • The area is large enough that you cannot lay and water it all within a day of delivery.

Not sure whether to do it yourself? See whether to lay sod yourself or hire a landscaper and what sod installation costs in Virginia. Browse more lawn and landscaping answers, compare sod installation services, or find lawn and landscaping businesses near Blacksburg. To have it done for you, describe your sod job once and local businesses can quote it.

Common questions

Can I lay sod over my existing grass?
No. Sod laid on top of old grass, debris or rocks cannot root into the soil. Strip the old turf, loosen and amend the soil, and rake it smooth and firm before the new sod goes down.
How long can sod sit on the pallet?
Not long. Virginia Tech's sod guide says to install it within eight hours of harvest and to keep it in the shade if that is not possible. Rolled sod heats up inside, so in summer it should go down the day it arrives.
Do I need to roll new sod?
Yes. Rolling the finished area with a heavy hand roller presses the roots against the soil and removes air pockets. Sod that is not in firm contact with the soil dries out and roots slowly.
Can I lay sod in winter in Virginia?
Yes, as long as the ground is not frozen and you can water it. Dormant sod still needs moisture, and in a dry winter it may need watering to keep it from drying out before it roots.
When can I walk on new sod?
Keep foot traffic to a minimum until it has rooted, which you can check by tugging a corner after about a week. Mow for the first time once it resists the tug and the soil is firm enough to hold you and the mower.
How much extra sod should I order?
Measure in square feet, convert to square yards, add a little for cuts around beds and curves, and ask the grower how they round orders. A pallet of standard small rolls usually holds 450 to 700 square feet.

Sources

  1. [1] Sod Source Selection, Installation, Maintenance, and Producers in Virginia (418-040), Virginia Cooperative Extension, Virginia Tech. Checked October 27, 2026.
  2. [2] Selecting Turfgrass for Virginia (SPES-748), Virginia Cooperative Extension, Virginia Tech. Checked October 27, 2026.
  3. [3] Summer Lawn Management: Watering the Lawn (430-010), Virginia Cooperative Extension, Virginia Tech. Checked October 27, 2026.
  4. [4] Stormwater Best Management Practice: Sodding (EPA-832-F-21-028LL), U.S. Environmental Protection Agency. Checked October 27, 2026.
  5. [5] Homeowners, Virginia 811. Checked October 27, 2026.

Want a pro to handle it?

Describe the job once. Licensed local businesses send quotes, and you pay only when you book one.