How do I pour a small concrete slab?

Submit a Virginia 811 locate request first, then dig out the area, set and brace forms at the right slope, and compact a firm base. Mix bagged concrete with measured water, fill the forms full depth, screed, float, edge and cut control joints, then keep the slab moist for five to seven days. Check your county's permit and zoning rules before you start.

Free to ask. Local shops send quotes, and you pay only when you book one.

By Kasra Taheri, Founder, LoclisPublished

Researched and drafted with AI, then checked claim by claim against the sources listed below before it was published. Prices and rules change; the dates beside each source say when it was last checked.

Step by step

Read when to stop and call a pro, further down this page, before you start.

  1. Step 1: Request a utility locate

    Contact Virginia 811 at least 3 working days before you dig and outline the slab area in white paint or white flags.[2]

  2. Step 2: Check permits and private lines

    Ask your county or town about building, zoning and HOA approval, and find private lines such as a shed feed or septic line yourself.[4][3]

  3. Step 3: Lay out the slab

    Stake out the slab with a tape and string, and plan a slope away from the house of about 1/4 inch per foot.[6]

  4. Step 4: Dig out and set the forms

    Remove the sod and soil to depth, then nail and stake the forms in place and backfill against them so they cannot move.[6]

  5. Step 5: Compact the base

    Remove topsoil and soft spots and tamp the subgrade firm and even, adding gravel where drainage is poor.[7][6]

  6. Step 6: Count the bags

    An 80 lb bag of Quikrete Concrete Mix yields about 0.60 cubic feet, so divide the slab's volume in cubic feet by 0.60.[8]

  7. Step 7: Put on protective gear

    Wear impervious gloves, a dust mask such as an N95, eye protection, long sleeves and rubber boots, and do not breathe the dust while you mix.[8][10]

  8. Step 8: Mix with measured water

    Start with about 6 pints of water per 80 lb bag and stay within about 6 to 9 pints in all.[8]

  9. Step 9: Place the concrete

    Lightly dampen the subgrade, then spread the concrete into the forms, working it into the corners and edges to the full depth.[6]

  10. Step 10: Screed and float

    Strike the surface off level with the forms using a straight board, then float it smooth with a darby or bull float.[6]

  11. Step 11: Edge and cut joints

    Run an edging tool along the forms, then cut control joints with a groover so the slab is divided into roughly square panels.[6][7]

  12. Step 12: Finish once the sheen is gone

    Wait until the water on the surface has disappeared, then trowel or pull a broom across it for a non-slip finish.[6]

  13. Step 13: Cure the slab

    Keep it continuously moist under wet burlap, plastic sheeting or a curing compound for 5 days at 70 F or above, or 7 days at 50 to 70 F.[8]

  14. Step 14: Protect and strip

    Keep the slab from freezing for the first 48 hours, and take the forms off once it has hardened, around 48 hours.[8][6]

A small slab, such as a patio, a pad for a grill or trash cans, or a short walk, is a job many homeowners can do with bagged concrete, some lumber and a helper. Whether it lasts comes down to the work before and after the pour: a utility locate, a firm base, forms set to the right slope, joints in the right places, and a week of curing. This guide covers slabs on the ground that carry people and light loads. A slab that will hold up a shed, a garage or a room is a foundation, and a different job.

Before you dig: utility lines and permits

Virginia law says: "No person shall make or begin any excavation or demolition without first submitting a locate request to the notification center."[1] Virginia 811 asks homeowners to contact it at least 3 working days before excavation, and to outline the area where you plan to dig in white paint or white flags.[2] Once the lines are marked, it explains that state law sets a two-foot tolerance zone on either side of the marks, where only certain digging, such as with hand tools, is allowed.[2]

Utilities mark only their own lines. Virginia 811 lists lines running from your home to a detached garage or shed, invisible pet fences, and septic and propane lines among the private lines that will not be marked.[3] If any of those could be near the slab, find them before you dig.

Whether a slab needs a building permit is a local call. Prince William County lists "Concrete (patio) slabs on grade that are not designed to support a future building addition" among work that needs no building permit, and notes that zoning or watershed approval will be required.[4] Pittsylvania County lists "On-grade patios" under work that needs no building permit, and adds that setbacks and other zoning requirements may still apply.[5] Other localities set their own rules, so ask your county or town building office, and check your HOA rules, before you buy materials.

Plan the slab

Thickness. Quikrete's instructions say sidewalks should be at least 4 inches thick, and simple slabs for small bases are normally 4 to 6 inches thick, depending on the load.[6]

Slope. Water has to run off. A slope of about 1/4 inch per foot away from the house is generally recommended, but check local codes and conditions.[6]

Base. A slab is only as good as what is under it. VDOT's sidewalk specification has its contractor excavate, shape and compact the earthen foundation to a firm, even surface, with unsuitable material removed and replaced.[7] For a home slab that means digging out topsoil and soft spots and tamping what is left. Quikrete adds that where drainage is poor, dig deeper and add several inches of gravel or crushed stone to the subbase.[6] A hand tamper is usually enough for a small pad; a rented plate compactor helps on anything larger.

How much concrete. Multiply length by width by thickness, all in feet, to get cubic feet. An 80 lb bag of Quikrete Concrete Mix yields about 0.60 cubic feet,[8] so a 10 by 10 foot slab 4 inches thick (about 33 cubic feet) takes about 56 bags. If you order ready-mixed concrete, add a margin on top of the volume you worked out, since forms and ground are never perfectly true. If you go that route, check access first: a loaded truck is very heavy and may not be able to cross soft ground, loose dirt or residential curbs.

Workers in hard hats pull a wooden screed board across freshly placed concrete in a sidewalk form, with a ready-mix truck behind them
U.S. Navy photo by Chief Mass Communication Specialist Yan Kennon, Public domain, via Wikimedia Commons

Protect your skin, eyes and lungs

Wet concrete is caustic. Quikrete's safety data sheet for its concrete mixes says the product "Causes severe skin burns and serious eye damage".[10] It warns that burns from Portland cement may not cause immediate pain or discomfort, and they can become worse even after contact has ended.[10] The dry mix is a hazard as well. The mix contains crystalline silica, and its hazard statements include "May cause cancer through chronic inhalation".[10] Quikrete warns: "Prolonged or repeated inhalation of dust may cause lung damage or cancer."[8] Quikrete calls for impervious gloves such as nitrile, a mask and eye protection,[8] and for a NIOSH-approved respirator such as an N95 in poorly ventilated areas, when used for extended periods, when use is frequent, or when permissible exposure limits may be exceeded.[10] Add long sleeves and rubber boots, mix outdoors, and open bags gently to keep the dust down. If concrete gets on your skin, Quikrete says to remove all product from the body and rinse thoroughly with water, and to see a health care professional right away if you suspect a cement burn.[10] Do not kneel in wet concrete without waterproof pads.

Pour day

Have every tool, every bag and a helper ready before you mix the first batch; concrete does not wait. Quikrete's data sheet calls for about 6 pints of water per 80 lb bag, with a final water content of about 6 to 9 pints per bag.[8] Resist the urge to make it soupy; extra water weakens the mix and makes the slab more likely to crack.

Watch the forecast. In cold weather, do not pour on a frozen subgrade; VDOT's specification has its contractor prevent the temperature at the surface of the concrete from falling below 40 degrees F during the first 72 hours immediately following concrete placement.[7] In hot, dry or windy weather, the same specification says care shall be taken to protect the concrete from shrinkage cracking by applying the curing medium at the earliest possible time after finishing operations and after the sheen has disappeared from the surface.[7]

Joints and finishing

Concrete shrinks, so it will crack somewhere. Joints decide where. Quikrete's instructions cut 1-inch control joints every 6 to 8 feet in a 4-inch slab.[6] VDOT's sidewalk specification divides the slab into sections approximately 5 feet long with control joints that extend into the concrete at least 1/4 of the depth, and where a slab is more than 7 feet wide it adds joints lengthwise to obtain uniform blocks that are approximately square.[7] Aim for square or nearly square panels. Where the slab meets the house, steps or another slab, put in a strip of premolded joint filler so each part can move on its own; VDOT requires preformed joint filler between its sidewalk and any adjacent fixed structure.[7]

Close-up of a broom-finished concrete slab where two saw-cut control joints cross
Photo: ChicagoConcrete (Chicagoland Concrete, Inc.), CC BY-SA 3.0, via Wikimedia Commons

Timing matters more than technique. Quikrete says troweling takes place after the surface moisture has evaporated from the surface and the concrete has lost its sheen,[6] and that when a coarse finish is desired for nonslip footing, floating, edging and grooving may be the only steps performed.[6] Wait for the sheen to go, then trowel or broom. Overworking the surface usually does more harm than good.

Curing

Curing is keeping the slab wet and warm enough while it gains strength. Quikrete says to cure for 5 days in warm weather at 70 F or higher, or 7 days in colder weather at 50 to 70 F, using wet burlap, plastic sheeting, a sprinkler or a curing compound.[8] If you cure with water, Quikrete says water curing with lawn sprinklers, nozzles or soaking hoses must be continuous to prevent interruption of the curing process,[8] so a hose run once in the evening does not count. Quikrete also says to protect concrete from freezing during the first 48 hours,[8] and to carefully remove the forms after the concrete has hardened, 48 hours or so.[6] For vehicles, read how long new concrete should cure before you drive on it.

Stop and call a pro if

  • You have no locate ticket or the marks are missing. Do not dig. If you hit a line, Virginia 811 says to stop digging, call 911 if a hit line releases flammable, toxic or corrosive gas or liquid, then notify the utility and Virginia 811.[2]
  • The slab will carry a structure. A shed, garage, room or anything a building official would call a foundation needs to be designed for its load; ask the building office before you plan it.
  • The slab is big, or a truck cannot reach it. Past a few dozen bags, a crew with ready-mix, a pump or a buggy is usually faster and more even.
  • It meets a street, curb or public sidewalk. Quikrete notes that the part of a driveway between the street and the sidewalk is usually controlled by the local municipality, and permission must usually be obtained before cutting a curb.[9]
  • The ground is soft, wet or recently filled. A base that will not compact needs more than a hand tamper.
  • You find cracks you cannot explain. See why new concrete cracks.

Getting it done in Virginia

If you would rather hire it out, read what to ask a concrete contractor before hiring them and what a concrete slab costs in Virginia. Loclis lists DPOR-licensed businesses with their licence number and class; look up concrete contractors in Blacksburg, browse concrete and flatwork, or see every concrete and hardscaping answer.

When you are ready, describe the slab once and licensed local businesses quote it.

Common questions

Do I need a permit to pour a concrete patio in Virginia?
It depends on the locality and the use. Prince William County exempts patio slabs on grade that are not designed to support a future building addition from a building permit, while still requiring zoning or watershed approval. Pittsylvania County lists on-grade patios as needing no building permit, though setbacks and other zoning rules may still apply. Call your own county or town before you dig, and check with your HOA.
Do I have to call 811 just to dig out a patio?
Yes. Under Virginia law no person may begin any excavation without first submitting a locate request, and Virginia 811 asks for at least 3 working days' notice. The service marks public utility lines; private lines such as a feed to a shed or a septic line are not marked.
How thick should a small slab be?
Quikrete's instructions call for sidewalks at least 4 inches thick and simple slabs for small bases at 4 to 6 inches, depending on the load. A pad for heavier equipment, or anything that might carry a structure later, should be designed for that load rather than guessed.
How many bags of concrete do I need?
Work out the volume in cubic feet (length times width times thickness in feet) and divide by the bag yield. An 80 lb bag of Quikrete Concrete Mix yields about 0.60 cubic feet, so a 10 by 10 foot slab 4 inches thick needs about 56 bags before any allowance for waste.
Is wet concrete dangerous to skin?
It can be. Quikrete's safety data sheet says the product causes severe skin burns and serious eye damage, that cement burns may not hurt at first, and that they can get worse after contact ends. The dry mix is a hazard too: breathing the dust over time can damage the lungs or cause cancer. Wear impervious gloves, a dust mask, eye protection and rubber boots, rinse off any contact with water, and see a health care professional if you suspect a burn.
When can I walk on a new slab?
It depends on the mix and the weather; cool weather slows everything down. Light foot traffic once the surface is hard enough not to mark is usually fine, but keep curing the slab for the full five to seven days, and see the separate answer on driving on new concrete before you park on it.

Sources

  1. [1] Va. Code § 56-265.17, Notification required prior to excavation or demolition; waiting periods; marking of proposed site, Code of Virginia, Virginia General Assembly. Checked October 26, 2026.
  2. [2] Homeowners FAQ, Virginia 811. Checked October 26, 2026.
  3. [3] Private Utilities Explained, Virginia 811. Checked October 26, 2026.
  4. [4] Do I Need a Permit?, Prince William County Building Development Division. Checked October 26, 2026.
  5. [5] Do I Need a Permit, Pittsylvania County Building Inspections. Checked October 26, 2026.
  6. [6] Concrete Sidewalks and Small Slabs (project instructions), The QUIKRETE Companies. Checked October 26, 2026.
  7. [7] Road and Bridge Specifications 2020, Sections 217, 316 and 504, Virginia Department of Transportation. Checked October 26, 2026.
  8. [8] QUIKRETE Concrete Mix No. 1101 data sheet, The QUIKRETE Companies. Checked October 26, 2026.
  9. [9] Concrete Driveways and Curbs (project instructions), The QUIKRETE Companies. Checked October 26, 2026.
  10. [10] Safety Data Sheet C1: Portland Cement Based Concrete Products, The QUIKRETE Companies. Checked October 26, 2026.