Skip to content

How do I waterproof a shower before tiling?

Cover the whole wet area with a waterproofing membrane rated for showers, over a substrate its maker approves, such as cement backer board. With a liquid membrane, reinforce corners, seams and the drain first, roll on two full coats at the coverage on the label, check for pinholes, let it cure, then flood test the floor before any tile goes on.

Free to ask. Local shops send quotes, and you pay only when you book one.

By Kasra Taheri, Founder, LoclisPublished

Researched and drafted with AI, then checked claim by claim against the sources listed below before it was published. Prices and rules change; the dates beside each source say when it was last checked.

Step by step

Read when to stop and call a pro, further down this page, before you start.

  1. Step 1: Check the substrate

    Make sure the walls are cement backer board or another surface your membrane's data sheet lists for wet areas, not plain drywall, and that the floor slopes evenly to the drain.

  2. Step 2: Read the data sheet

    Download the membrane maker's technical data sheet and note its coverage rate, number of coats, temperature limits and flood-test wait, because those numbers differ between products.

  3. Step 3: Clean and dry the surface

    Vacuum dust, scrape off mortar lumps and wipe away grease so the membrane can bond; the surface should be sound, clean and dry.

  4. Step 4: Fill gaps and cracks

    Fill board seams, gaps and small non-structural cracks with thinset mortar or the membrane itself, as the data sheet allows.

  5. Step 5: Reinforce corners and seams

    Brush a band of membrane over every inside corner, board seam and wall-to-floor joint, and embed the maker's reinforcing fabric or tape where the data sheet calls for it.

  6. Step 6: Treat the drain and pipes

    Work the membrane onto the bonding flange of an existing drain made for bonded membranes, and around the valve and shower-arm openings, following the maker's drain detail.

  7. Step 7: Apply the first full coat

    Roll or brush a continuous, even coat over the whole wet area, including the reinforced spots, at the coverage rate on the label.

  8. Step 8: Wait for the colour change

    Let the first coat dry until it changes to its fully dry colour, then look closely for pinholes, thin spots and voids and fill them.

  9. Step 9: Apply the second coat

    Roll the second coat at right angles to the first so the two layers cover each other's thin spots.

  10. Step 10: Let it cure

    Keep the room within the temperature range on the data sheet and let the membrane cure for the full time it lists before testing.

  11. Step 11: Flood test the floor

    Plug the drain, fill the shower floor with water to just below the top of the curb, mark the level, and check the level and the room below after the test period; any drop means a leak to find and fix before tiling.

  12. Step 12: Tile with a compatible mortar

    Set the tile with the thinset the membrane maker names, and do not use a premixed tile adhesive over the membrane.

You waterproof a shower by covering everything that gets wet, the floor, the walls to above the shower head and every corner, seam, niche and pipe opening, with one continuous membrane made for showers. Tile and grout do not do this job: membrane makers state that mortars and grouts for tile are not replacements for a waterproofing membrane.[2] The membrane is what keeps water out of the framing.

The most common homeowner method is a liquid-applied membrane rolled or brushed onto cement backer board. The work is not hard, but it is unforgiving, and the product's data sheet is the rulebook. The details below come from two widely sold liquid membranes, Custom Building Products' RedGard and LATICRETE's HYDRO BAN; if you use something else, its own sheet governs.

A walk-in shower tiled in lavender squares with green trim, a built-in wall niche, a handheld shower head and a white hexagon mosaic floor with a round drain
Photo: David Brossard, CC BY-SA 2.0, via Wikimedia Commons

Start with the right surface

A membrane is only as good as what it is stuck to. RedGard lists drywall only for interior dry areas,[1] and HYDRO BAN's data sheet limits gypsum wallboard to non-wet areas and says not to bond it to OSB, particle board or interior glue plywood.[2] Both list cement backer board as a suitable substrate.[1][2] If your shower walls are drywall or green board, they come out before you waterproof.

The floor has to drain before it is waterproofed. RedGard's instructions call for the substrate to be properly sloped toward the drain flange before the membrane goes on,[1] and its data sheet gives a minimum pitch of 1/4 inch per linear foot for drainage areas.[1] Low spots under the membrane become puddles under the tile.

The drain has to be one a membrane can bond to. HYDRO BAN's data sheet says the drain must be a bonding-flange or clamping-ring type with weep holes.[2] If your existing drain is not that kind, changing it is plumbing work, not waterproofing.

Corners, seams and the drain come first

Water finds the joints, so they get extra material before the main coats. RedGard asks for corners and floor-to-wall intersections to be coated more than 2 inches on either side, and suggests embedding reinforcing tape for extra protection at changes of plane and over gaps wider than 1/8 inch.[1] HYDRO BAN calls for a band about 8 inches wide over coves and floor-to-wall transitions.[2] Treat board seams, the inside corners of a niche, a bench, the curb and the openings around the valve and shower arm the same way.

Coats, coverage and colour

Thickness is what makes a liquid membrane waterproof, and the coverage rate on the label is how you control it. RedGard's general rate is 110 square feet per gallon per coat, with at least two coats when you use a roller or brush.[1] To meet the ANSI A118.10 waterproofing standard, the same data sheet calls for two coats at 80 square feet per gallon each.[1] Measure the wet area, work out how much product that means, and check that you have used about that much when you finish.

Both products tell you when a coat is dry by changing colour. RedGard goes on pink and dries dark red, typically in 1 to 1.5 hours per coat;[1] HYDRO BAN changes from light sage to olive green.[2] Inspect the first coat in good light before the second goes on. Pinholes and thin, translucent patches are easy to see at that point and impossible to see once tile covers them.

Temperature matters. RedGard needs air and surface temperatures above 40°F during application and for 72 hours after,[1] which can be an issue in an unheated Virginia addition or basement bathroom in winter.

Flood test before you tile

A flood test is the one way to know the floor holds water before it is buried. HYDRO BAN allows flood testing about 2 hours after final cure at 70°F and 50 percent humidity, and 24 hours when the room is between 50 and 69°F.[2] Plug the drain, fill the floor to just below the top of the curb, mark the water line, and check it, and the ceiling below if there is one, before you drain it. HYDRO BAN's data sheet also tells installers to get approval from the local building code authority before using it in shower pan applications,[2] so ask your building office if you are replacing a shower pan.

Tile with the right mortar

The membrane is a bonding surface, not an adhesive. RedGard's data sheet calls for a polymer-modified mortar meeting ANSI A118.4 or A118.15 and says not to use premixed adhesives over the membrane.[1] Where tile meets the tub, the floor or another wall, finish with flexible caulk rather than grout; see how to recaulk a tub or shower.

Safety and permits

For RedGard, the maker says to wear impervious gloves such as nitrile and eye protection, and use it in a well-ventilated area.[1]

Virginia's building code lists installation or replacement of floor finishes, and replacement of interior wall finishes in homes, among ordinary repairs that do not need a permit application.[3] But work that alters the water supply, drainage or vent system does need a permit,[3] and so does removing or disturbing asbestos-containing materials during construction.[3] If you are tearing out tile and mastic in an older house, EPA says you generally cannot tell whether a material contains asbestos by looking at it,[4] and remodeling is one of the reasons to have it inspected by an accredited professional.[4]

Stop and call a pro if

  • The drain, valve or supply pipes need to move or be replaced. That is permit work for a licensed plumber.
  • Demolition turns up soft or rotted studs, subfloor or joists. Framing repair comes before any membrane.
  • The floor has no slope to the drain, or you need a new mortar bed or shower pan. Many homeowners hire this part even when they waterproof the walls themselves.
  • The flood test fails and you cannot find where the water is going.
  • The old tile, mastic or wall material may contain asbestos.

If something has already gone wrong in an existing shower, start with why a tile shower leaks. You can browse shower tile installers, look up flooring and tile businesses around Blacksburg, or read the other flooring and tile answers. To have a licensed installer quote the whole job, describe your shower on Loclis.

Common questions

Isn't grout waterproof?
No. Tile and grout shed most of the water, but cement grout absorbs some, and membrane makers state plainly that mortars and grouts are not a replacement for a waterproofing membrane. The membrane under the tile is what keeps water out of the wall and floor.
Can I put a waterproofing membrane over regular drywall in a shower?
Not with the common liquid membranes. RedGard lists drywall only for interior dry areas, and HYDRO BAN limits gypsum wallboard to non-wet areas. Use cement backer board or another board the membrane maker lists for showers.
How long should I wait before flood testing?
It depends on the product and the room temperature, so follow the data sheet. As one example, HYDRO BAN allows flood testing about 2 hours after final cure at 70°F and 50 percent humidity, and 24 hours when the room is between 50 and 69°F.
Do I need a permit to waterproof and retile my shower in Virginia?
Replacing floor and wall finishes is listed as an ordinary repair that does not need a permit application under the Uniform Statewide Building Code. Moving or replacing the drain, valve or supply pipes alters the plumbing system and does need a permit, and a licensed plumber should do that part.
Should I use a liquid membrane or a sheet membrane?
Both work when installed to the maker's instructions. Liquid membranes are rolled or brushed on and are forgiving around odd shapes; sheet membranes are bonded on with thinset and give a known thickness without measuring coats. Pick one system and use that maker's drain, corner and seam parts with it.
How many coats of RedGard do I need?
At least two when you apply it with a roller or brush. Custom Building Products' general rate is 110 square feet per gallon per coat, and to meet ANSI A118.10 it calls for two coats at 80 square feet per gallon each.

Sources

  1. [1] RedGard Waterproofing and Crack Prevention Membrane, Technical Data Sheet TDS-104 (published 02/14/2025), Custom Building Products. Checked October 27, 2026.
  2. [2] HYDRO BAN Data Sheet DS-663, LATICRETE International. Checked October 27, 2026.
  3. [3] 13VAC5-63-80, Section 108 Application for permit (Virginia Uniform Statewide Building Code), Virginia Administrative Code, Virginia General Assembly. Checked October 27, 2026.
  4. [4] Protect Your Family from Exposures to Asbestos, U.S. Environmental Protection Agency. Checked October 27, 2026.

Want a pro to handle it?

Describe the job once. Licensed local businesses send quotes, and you pay only when you book one.