Skip to content

How do I set a fence post in concrete?

Request a Virginia 811 locate first, then dig a hole about three times the post's width and a third of its length deep, plus 6 inches. Tamp the bottom, add 6 inches of gravel, set and brace the post plumb, pour fast-setting concrete dry to 3 to 4 inches below grade, add water, and backfill with soil once it sets.

Free to ask. Local shops send quotes, and you pay only when you book one.

By Kasra Taheri, Founder, LoclisPublished

Researched and drafted with AI, then checked claim by claim against the sources listed below before it was published. Prices and rules change; the dates beside each source say when it was last checked.

Step by step

Read when to stop and call a pro, further down this page, before you start.

  1. Step 1: Request a utility locate

    Submit a locate request to Virginia 811 and wait until every utility has marked its lines or posted a clear response before you dig.[1][2]

  2. Step 2: Lay out the line

    Stretch a string between the end and corner posts and mark each hole along it, keeping clear of any utility paint marks.

  3. Step 3: Dig the hole

    Make it about three times the post's width and a third of the post's overall length deep, plus 6 inches for gravel.[3]

  4. Step 4: Add gravel

    Tamp the sides and bottom firm, then put about 6 inches of gravel or crushed stone in the bottom for drainage.[3]

  5. Step 5: Set and brace the post

    Stand the post on the gravel, screw two angled braces to adjacent sides, stake them, and check plumb on both faces with a level.[4]

  6. Step 6: Pour the dry mix

    Pour fast-setting concrete dry from the bag to 3 to 4 inches below the top of the hole, then recheck plumb.[3]

  7. Step 7: Add water

    Pour about a gallon of water per 50-pound bag over the mix and let it soak in; fill holes deeper than 2-1/2 feet in two lifts.[3]

  8. Step 8: Let it set

    Leave the braces on while it sets, which takes 20 to 40 minutes, and longer when it is below 72 degrees.[3]

  9. Step 9: Backfill and finish

    Fill the last few inches with soil or sod and shape it so water runs away from the post, then hang rails once the post is firm.

To set a fence post in concrete, get your utility lines marked first, then dig a hole about three times the post's width and a third of its length deep, plus 6 inches. Put gravel in the bottom, brace the post plumb, pour fast-setting concrete in dry, add water, and finish the top few inches with soil. Most of the work is in the layout and the digging; the concrete itself takes minutes.

An unpainted wooden board privacy fence with a lattice top and capped square posts, behind a bed of small shrubs
Privacy Fence, Public domain, via Wikimedia Commons

Call Virginia 811 before you dig

Virginia law says no person shall begin any excavation without first submitting a locate request to the notification center,[1] which is Virginia 811. A post hole counts. After you submit the request, you may start only after you have confirmed, on the center's positive response system, that each utility has marked its lines, said it has none in the area, or otherwise posted a response that digging may begin.[1] Virginia 811 asks you to contact it three days before any digging project, fences included, and the service is free.[2] A request stays valid for 15 working days,[1] so plan to dig within that window.

The marks show the approximate location of each line. Keep post holes well away from them, and if a hole has to land near a mark, move the post or change the spacing rather than dig on top of a line.

Choose posts that can live in the ground

Posts should be long enough to cover the fence height, the setting depth and another 6 inches.[5] Buy lumber treated for ground contact, not the above-ground grade sold for deck boards: in the treating industry's system, UC4 is the use category for wood used in ground contact in exterior applications.[6] The tag stapled to the end of each post usually names the use. QUIKRETE's own list calls for a post that is rot-resistant wood, rust-resistant metal or an appropriate synthetic.[4]

If you cut a treated post, the fresh end is less protected than the factory-treated surface. The Forest Products Laboratory says the damage can be partly made up with a thorough coat of copper naphthenate (1% to 2% copper) on the cut surface.[6] Put the factory end in the ground and the cut end on top, under a post cap.

Dig the right hole

QUIKRETE's project sheet says to make the hole about three times the post's diameter, and as deep as one-third of the post's overall length plus 6 inches for a gravel base.[3] QUIKRETE's web guide gives a slightly different rule, one-third to one-half of the above-ground length plus 6 inches.[4] Corner, end and gate posts take the most strain, so err toward the deeper figure for those.

Soil changes the hole too. For loose or sandy soil it recommends a tube form,[4] and the project sheet says to dig a larger, dish-shaped hole for posts set in loose or sandy soil.[3]

A clamshell post-hole digger works for a few holes in soft ground. A long digging bar breaks up clay and lifts out rocks. Keep the sides straight so the concrete collar is even all the way down.

Set, pour and cure

Tamp the sides and bottom of the hole, then add about 6 inches of all-purpose gravel or crushed stone to help drainage.[3] Stand the post on the gravel.

Bracing is what keeps the post straight while the concrete sets. Attach angled 2x4 braces to two adjacent sides of the post with one screw each, drive a stake near the lower end of each brace, check plumb on both of those sides with a level, and fasten the braces to the stakes.[4] On a long run, set the end posts first, stretch a string between them, and line up every post in between to the string.

With fast-setting mix, pour the dry mix straight from the bag until it is 3 to 4 inches below the top of the hole,[3] check plumb again, and pour water over it: about 1 gallon of water for each 50-pound bag, depending on the soil.[3] For holes deeper than 2-1/2 feet, fill to 2-1/2 feet or less, add water and let it soak all the way in before adding the rest of the mix and water.[3]

QUIKRETE's fast-setting mix sets in 20 to 40 minutes, and you should wait 4 hours before putting a heavy load on the post.[3] Below 72 degrees, it needs extra curing time.[3] On a cold autumn day in the Blue Ridge, leave the braces on longer than the bag suggests.

Finish by filling the last few inches with soil or sod. QUIKRETE suggests the gravel base and sloping the finished top so water runs away from the post[4] as ways to protect a wood post from rot. If you are building a slab or footing rather than a fence, how to pour a small concrete slab covers that work.

Pulling out an old fence first

Old pressure-treated posts may be the older arsenic-based kind. In December 2003, makers of chromated arsenical (CCA) treated wood stopped making it for homeowner uses.[7] If your fence is older than that, EPA advises goggles and a dust mask when sawing CCA-treated wood, washing your hands after handling it, and never burning treated wood at home.[7] Old concrete collars usually come out with the post; a digging bar and a lever under the post help.

Stop and call a pro if

  • A utility mark, a buried cable or an unmarked pipe turns up where a post has to go.
  • A post hole hits a large rock, a tree root bigger than your wrist, or a slab you cannot dig through by hand.
  • The fence will be a swimming pool barrier. The state building code exempts fences from a permit except fences required for pedestrian safety or used as a swimming pool barrier,[8] so that fence is permitted work.
  • The posts will hold up a gate wider than a walk gate, a deck, a roof or anything else that carries weight beyond the fence itself.
  • The fence line is on a steep slope, near a retaining wall, or you are unsure where the property line is.

For costs and rules, read what a fence costs in Virginia, whether you need a permit for a fence and why new fence posts lean. Browse fence installers, all exterior answers, or exterior businesses around Blacksburg. If you would rather have it built, describe the fence job once and local businesses send written quotes.

Common questions

Do I really have to call 811 just to dig a few post holes?
Yes. Virginia's Underground Utility Damage Prevention Act applies to any excavation, and Virginia 811 names fences as one of the projects to call about. The request is free, and you wait until every utility has marked its lines or posted a response before digging.
How deep should a fence post be?
QUIKRETE's project sheet uses one-third of the post's overall length, plus 6 inches for a gravel base. Its web guide puts it at one-third to one-half of the above-ground length plus 6 inches. Corner, end and gate posts carry more load, so many builders set those deeper and wider.
Do I mix the concrete first or pour it in dry?
Fast-setting post mix is made to go in dry. Pour it into the hole to 3 to 4 inches below grade, then add about a gallon of water per 50-pound bag and let it soak in. Ordinary concrete mix is mixed first and takes longer to firm up.
When can I hang the rails and pickets?
QUIKRETE's fast-setting mix sets in 20 to 40 minutes and can take a heavy load after 4 hours, with more time needed below 72 degrees. Leave the braces on until the post is firm and add rails after that.
Should the concrete come up to the surface?
QUIKRETE's directions stop the concrete 3 to 4 inches below ground and fill the rest with soil or sod. Shaping the top so water runs away from the post helps keep water from sitting against the wood.

Sources

  1. [1] Va. Code § 56-265.17, Notification required prior to excavation or demolition, Code of Virginia, Virginia General Assembly. Checked October 26, 2026.
  2. [2] Virginia 811: Safety is in Your Hands, Virginia 811. Checked October 26, 2026.
  3. [3] Setting Posts Project (Fast-Setting Concrete), The QUIKRETE Companies. Checked October 26, 2026.
  4. [4] Setting Posts in Concrete, The QUIKRETE Companies. Checked October 26, 2026.
  5. [5] Fencing Materials for Livestock Systems, publication 442-131 (archived), Virginia Cooperative Extension, Virginia Tech. Checked October 26, 2026.
  6. [6] Wood Handbook, Chapter 15: Wood Preservation, USDA Forest Service, Forest Products Laboratory. Checked October 26, 2026.
  7. [7] Chromated Arsenicals (CCA), U.S. Environmental Protection Agency. Checked October 26, 2026.
  8. [8] 13VAC5-63-80, Section 108 Application for permit (Virginia Uniform Statewide Building Code), Virginia Administrative Code, Virginia General Assembly. Checked October 26, 2026.

Want a pro to handle it?

Describe the job once. Licensed local businesses send quotes, and you pay only when you book one.